
The bulk of the internal partitions are in place now the only room not to have a timber frame yet in place is the kitchen although the floor does have a timber baton layout on the floor so one can appreciate the size it is going to be.

The stone work on the outside walls is receiving a final dose of pointing. The back is looking good - the utilities should soon be in place then that area can be paved.
The next big job is the floor. Given that next weekend is Easter and the site will be closed I wold imagine that the screeding will be completed late next week so that it can dry over the weekend.
CB